本文介绍了广东省工商银行大楼 6层地下室的 2 0 3m深基坑围护结构的设计与施工方法 ,并通过对整个施工全过程的信息化监测 ,利用反馈的信息对原设计进行不断的优化 ,使之达到最佳的安全与经济效果
This article introduces the design and construction method of 203m deep foundation pit retaining structure in the basement of the 6th floor of the Industrial and Commercial Bank of China building. Through the information monitoring of the entire construction process, the original design is continuously optimized by the feedback information , So as to achieve the best safety and economic results