近年来,我段整险工程,在党和上级的领导下,以及本段职工同志的努力,使质量和效率较前有了显著地提高。在1956年和1957年春新修的32、29两道丁扣石坝及在东平湖修做的丁扣护坡,均基本达到或超过了上级规定的指标。在工程质量方面:按照计划设计尺度,基础挖至最低枯水位下0.5—0.7公尺,并依照塘石密度的标准,分坯砸实,然后上砌丁扣沿子石,做
In recent years, with the efforts of our Party headquarters and superiors under the leadership of our Party and the staff and workers in this paragraph, the quality and efficiency of our work on a straight line has been significantly enhanced. The 32,29 Dingding buckets newly constructed in the 1956 and the 1957 spring and the Dinggua slope protection repaired in Dongpinghu basically met or exceeded the targets set by the higher authorities. In terms of quality of the project: According to the planned design scale, the foundation should be dug to 0.5-0.7 meters at the lowest dry water level. According to the standard of pond stone density,