东津水电站位于修水河上游老区修水县境内,是一座总畜水量八亿立方米,发电装机六万千瓦的中型水电站。它是60年代后期,国家为解决赣西北“三线”建设和边远山区资源开发的用电问题,于1969年批准、纳入当年国家计划,由地方组织开工兴建的。1972年缩短基建战线时停建。党的十一届三中全会以后,国家水电部安排设计部门对东津水电站原设计进行复核论证,并于1984年审查批准了该设计复核修改报告。由于建设资金等原因,工程复建计划至今未能实施。
Dongjin Hydropower Station is located in Xiujiang upstream of Xiujiang County, is an area of 800 million cubic meters of total livestock, power generation installed capacity of 60,000 kilowatts of medium-sized hydropower station. It is the late 60s, the state to solve the “third line” construction in northwestern Jiangxi and remote mountain resources development issues of electricity, approved in 1969, into the national plan of the year, started by local organizations to build. When the shortening of the capital construction front in 1972, it was stopped. After the Third Plenary Session of the 11th CPC Central Committee, the Ministry of Mines and Water Resources arranged the design department to verify the original design of Dongjin Hydropower Station. In 1984, the design review report was reviewed and approved. Due to construction funds and other reasons, the project has not been implemented so far.