论文部分内容阅读
前言受中国国际工程咨询公司的聘请,由设计、科研、施工、制造、管理单位及高等院校各方面专家49人组成的专家组,于1986年11月29日至12月13日在成都对雅砻江二滩水电站初步设计报告进行评估。专家组查勘了坝址现场、察看了枢纽布置和导流工程的水工模型试验、听取了设计单位及有关部门的介绍,研究了设计文件及历次审查意见,了解了中外专家咨询建议,并与有关单位代表交换了看法,现提出本评估意见。一、工程及设计概况二滩水电站地处雅砻江下游,位于四川省西部,距渡口市40余公里。坝址下游距成昆铁路桐子林车站18公里,现有公路通过坝址,对外交通方便。
Preface By the China International Engineering Consulting Company hired by the design, research, construction, manufacturing, management units and institutions of higher learning 49 experts in various groups, from November 29, 1986 to December 13 in Chengdu on Yalong River Ertan Hydropower Station preliminary design report to assess. The expert team surveyed the site of the dam site, examined the hydraulic model test of the layout and diversion project of the hub, listened to the introduction of the design unit and relevant departments, studied the design documents and previous reviews, learned about the advice of Chinese and foreign experts, and The representatives of the relevant units exchanged their views and hereby present this assessment opinion. I. Engineering and Design Overview Ertan Hydropower Station is located in the lower reaches of the Yalong River, located in the western part of Sichuan Province, 40 kilometers away from the ferry. Dam downstream from the Cheng Kung Railway Tongzilin Station 18 km, the existing highway through the dam site, external traffic convenience.