澄合矿务局王村矿自备电厂于1992年11月23日并网发电.澄合矿务局王村自备电厂,是在王村煤矿锅炉房的基础上,由原陕西省煤管局以陕煤局发(88)378号文批准改建的。该电厂是在满足矿井供热的前提下,利用锅炉余力发电(两台20t/h 链条采暖锅炉)。王村煤矿自备电厂建设规模为2×3000kW,设计能力为年发电3174万 kWh,年创利180万元,全部工程费用1109.41万元,现在已完成1095万元,是由澄合矿务局用自筹资金兴建
Chengmian Mining Bureau Wangcun mine-owned power plant in November 23, 1992 grid-connected power generation. Chenguang Mining Bureau Wangcun owned power plant, is in the Wangcun coal mine boiler room on the basis of the original coal from Shaanxi Province Bureau of Shaan Coal Bureau issued (88) 378 text approved alteration. The power plant is to meet the mine heating under the premise of the use of excess power boiler (two 20t / h chain heating boiler). Wangcun Coal Mine owned power plant construction scale of 2 × 3000kW, design capacity of 31.74 million kWh of annual power generation, profit 1.8 million yuan, the entire project cost 11,094,100 yuan, has now completed 10,950,000 yuan, is by the Bureau of Mining Mining Bureau with Self-financing construction