浅论工程造价管理全过程控制的重要性

来源 :工程经济 | 被引量 : 0次 | 上传用户:hhy0412
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 工程造价管理全过程控制的必要性谈到工程造价的管理和控制,我们便习惯地想到是工程预决算,确实,就目前的体制和现实而言,工程造价的管理和控制工作就是预决算,即预决算人员根据已经确定的施工图计算工程量、套用定额、计取费用(施工图预算),或在施工结束后,根据图纸和施工组织设计,以及现场施工签证记录等资料编制竣工决算。这固然是必要的,有用的,但我们也要看到,当预决算人员编制施工图预算或竣工决算时, 1 Project Cost Management The necessity of the whole process control When it comes to project cost management and control, we used to think of the project budget, indeed, the current system and reality, the project cost management and control work is the final budget , That is, the budgetary defaulters calculate the amount of works according to the confirmed construction drawings, apply the quota and charge fees (construction drawing budget), or prepare the final accounts according to the drawing and construction organization design and the on-site construction visa records after the construction is completed . While this is necessary and useful, we must also see that when budgeting staff prepare budgets for construction drawings or final accounts,
其他文献
随着社会主义市场经济体制的确立,基本建设管理工作也发生了巨大的变化,正逐步由传统和单一的概预算定额管理模式向科学和全面的建设工程造价管理模式转变。如何适应形势的
自1985年12月国家计委发布《民用爆破器材工厂设计安全规范》GBJ89-85以来,已时过12年。随着民用爆破器材产品品种的增加,工艺技术的提高,以及国情的变化,该规范已不能适应
《小学生天地》1998年第6期中有这样一段话:“如保存在琥珀中的昆虫化石,栩栩如生;保存在冻土内的猛犸象,皮毛血肉俱全,但这种化石极为罕见。”《咬文嚼字》1998年第8期《不
Internet最令人兴奋的功能之一便是提供对已有应用软件的更新及完善。感谢Internet,它使得拥有一种软件并不断更新变得容易多了。当你得到一个新程序时,你只需敲几下鼠标就
近年来,为积极应对国际金融危机,有效化解钢铁产能供大于求的难题,不断淘汰落后产能给企业带来的不利局势,临钢公司党委运用战略思维,把握行业发展趋势,坚持党管干部原则,采
各位秘书长、各位代表、同志们: 全国建设工程造价管理协会秘书长工作联席会议,经全体与会同志共同努力就要结束了,一天半的会议尽管时间短,但信息量大,内容丰富,重点突出,
年内五大消防科技目标1全面宪成119消防通信指挥系统二期建设,进一步提高消防快速反应能 力和消防指挥决策水平。2基本建成办公自动化系统,提高消防行政管理效率和消防行政决策水平
(一)南京第二邮政枢纽包件处理车间,于2002年8月20日正式投产使用。投产初期,普包和挂刷上机分拣,快递包裹不上机,由人工分拣。快包处理设有两个作业班次,共有生产人员21人,
病例摘要患者,男,61岁,职员。因乏力,食欲不振,巩膜和皮肤黄染,肝区痛半个月,于1986年7月19日入院。患者自半月前起乏力、头晕、食欲不振、厌油、腹胀,伴肝区隐痛,偶尔有鼻
一、规范修编概况《通风与空调工程施工及验收规范》的修订是根据国家计委综合[1992]490号文,建设部司发文(92)建标字10号《1992年工程建设标准制订、修订计划》,由上海市建