论文部分内容阅读
改进发电调度方式的工作从酝酿至今,一年多来一直是各界关注的焦点。此间,国务院领导曾多次给予批示,电力体制改革工作小组第九次会议将其列入“十一五”深化电力体制改革的主要任务之一,国家发展改革委组织了全国调研,起草了相应办法,对节能调度提出明确方向。根据国务院要求,各地方政府、国有大型企业签订了关停小火电机组目标责任书,在电力行业节能降耗、污染减排方面采取了强有力的措施。本栏的报道,从发电节能调度的现实意义、方式选择、区域案例等方面,研讨、介绍了改进发电调度方式在具体执行过程中,所面临的问题及其政策建议,希望能给读者提供更多的启发和思考。
The work of improving the power generation dispatching mode has been the focus of attention of all circles for more than a year since it was brewing. During the meeting, leaders of the State Council have given instructions on many occasions. The Ninth Meeting of the Working Group on Power System Reform listed it as one of the major tasks for deepening the reform of the power system in the 11th Five-Year Plan. The National Development and Reform Commission organized a national survey and drafted the corresponding Approach, put forward a clear direction of energy-saving scheduling. According to the State Council’s request, all local governments and large state-owned enterprises signed a target letter of responsibility for shutting down small thermal power units and adopted strong measures in energy saving, pollution reduction and emission reduction in the power industry. The report in this column discusses and discusses the problems and policy proposals for improving the power generation dispatching method in the specific implementation of power dispatching from the aspects of practical significance, method selection and regional cases of power dispatching, hoping to provide readers with more More inspiration and thinking.