【摘 要】
:
随着我国加入WTO和全球经济一体化的到来,水电企业积极响应中央提出的“走出去”战略,近年来通过竞争,承揽了不少项目,成绩斐然。介绍了我国水电企业“走出去”的基本情况及
论文部分内容阅读
随着我国加入WTO和全球经济一体化的到来,水电企业积极响应中央提出的“走出去”战略,近年来通过竞争,承揽了不少项目,成绩斐然。介绍了我国水电企业“走出去”的基本情况及经验,分析了影响水电企业“走出去”战略实施的因素,提出了相关的对策和建议。
With China’s accession to the WTO and the advent of global economic integration, hydropower enterprises have responded positively to the “going out” strategy put forward by the Central Government and have won numerous projects through competition in recent years. This paper introduces the basic situation and experience of “Going Global” of hydropower enterprises in our country, analyzes the factors affecting the implementation of “Going Global” strategy of hydropower enterprises, and puts forward some countermeasures and suggestions.
其他文献
请下载后查看,本文暂不支持在线获取查看简介。不断前进的仲恺农业技术学院
Please download to view, this article does not support online access to view profile. Zhon
以广州南沙西涌泵闸工程进水口挡墙基础处理为例,介绍水泥土搅拌桩的设计、施工工艺和施工质量控制以及检测结果。
Taking Guangzhou Nansha Xiongying Pumping Gate projec
1999年11月15日,新菏复线长东黄河特大二桥建成通车。长东黄河特大二桥是新菏复线上的控制工程,全长13.013km,被称为亚洲铁路第1长桥。全桥297孔,墩台299座,共用混凝土17万
大体积混凝土浇筑采取的温控措施必然要付出人力和物力,施工单位在投标报价时寸必须计取这部分费用,而每个项目施工中因当地气侯条件、项目类型、施工要求的不同也各不相同,
最近,新疆阜康矿难中有8名哈密煤矿技工学校毕业生遇难,在调查了解这一事件中发现,该校在安排学生实习过程中存在着生产实习教学疏于管理,随意调整教学计划,以及煤矿将学生充
场地分析:本方案位于白城市镇赉县境内,嫩江右岸的吉黑两省交界处1.26km的白沙滩。距白城市区14Okm。总用地11.8公顷。该工程的主要任务是为白沙滩灌区引水,远景结合吉林省白
本文结合实例,从承包商对工期索赔要求的论证以及工期索赔的计算等方面进行有针对性分析研究,论证了整个工期索赔工作的合理性,旨在为承包商进行工期索赔提供方法上的参考和
由水利部南京水利科学研究院出版资金资助、信息研究中心杨立信等编译、水文水资源研究所的教授级高级工程师、博士生导师刘国纬先生审校的《国外调水工程》一书最近已由中
国家电力监管委员会令第3号柴松岳主席日前签署国家电力监管委员会3号令,《水电站大坝运行安全管理规定》已经国家电力监管委员会主席办公会议通过,自2005年1月1日起施行。《
为应对全球日益恶化的环境,积极减少碳排放,水电作为优质、清洁能源已纳入国家“十二五”规划中。以生态环境保护为目的的水土保持工程在水电工程建设中凸显其重要性,通过其