附加疑问句用法的几个问题

来源 :黔东南民族职业技术学院学报(综合版) | 被引量 : 0次 | 上传用户:wzhl512
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
英语中,附加疑问句是由陈述句和附在其后的附加疑问句组成。其中附加疑问句是对陈述句所说的事实或观点提出疑问,起证实作用,一般用于证实说话者所说的事实或观点。其结构为:前一部分是一个陈述句,后一部分是一个简单的问句。完成后一部分简单问句时,前后两部分的人称和动词时态要保持一致。如果前一部分用肯定式,后一部分一般用否定式;反之,前一部分为否定式,后一部分要用肯定式,即“前肯定后否定,前否定后肯定”。 In English, the additional question is composed of the statement and the attached additional question. The additional interrogative sentence is a question that serves as a basis for questioning the facts or opinions stated in the statements and serves to confirm the facts or opinions of the speakers. Its structure is: the first part is a statement, the latter part is a simple question. After completing a part of the simple questions, the front and back two parts of the tense and verb tense to be consistent. If the former part is positive, the latter part is generally negative; otherwise, the former part is negative, and the latter part is positive, ie “positive negative” and “positive negative”.
其他文献
新沭河是沂沭泗流域的主要排洪入海河道之一。也是妥善处理全流域洪水,进行沂沭泗洪水东调入海的关键工程。新沭河集水总面积5500平方公里。它主要承泄上游沂蒙山区洪水,素
全国水文系统计算机应用技术经验交流会于5月24~27日在长沙市召开。会议由水利部水文司主持,来自全国各有关单位从事水文、水质监测工作的81名代表参加了会议。会议收到交流
由气象水文海洋仪器学会水文、海洋专业组联合召开的气象水文海洋自动测报技术研讨会于今年11月16~19日在重庆北碚举行。来自海洋技术研究所、海洋科技情报研究所、南京水利
1988年11月22日~24日,浙江省水利学会、水力发电工程学会施工及施工机械化专业委员会在遂昌县成屏一级电站工地召开了“堆石坝钢筋混凝土面板施工技术讨论会”。参加会议的有
窟窿山圩是西淝河流域的一个生产圩,圩内地面高程18.0~12.0米,圩堤高程22.5米。但由于圩堤施工时堤脚取土,圩内堤脚处遗留有宽约2.50米,深1.0米的坑塘,加之堤坡太陡(1;1.5)。
江苏苏北通榆河工程,由国家计委委托中国国际工程咨询公司列入1988年评估项目。开通通榆河,将改善苏北沿海交通条件。把长江、苏北灌溉总渠、新沂河等30多条入海流河串通起
1923年,马林诺斯基在奥格登和理查兹的《意义的意义》这本著作当中第一次提及了“情景语境”的概念,之后,这一理论便不断获得了充实和完善。把汉语作为第二语言对外国人进行
1.贯彻《水法》认真执法《中华人民共和国水法》从7月1日起开始施行了。水法颁布以后,全市在各级人大常委会和政府的领导下,普遍开展了水法宣传活动,做到家喻户晓。广大人民
宁武—静乐盆地位于山西省中西部,处于芦芽山与云中山之间,呈北东—南西向展布,为一自北东向南西掀斜的复向斜。核部由侏罗系构成,两翼地层产状较陡,依次由三叠系、二叠系、石炭系
听音解义的问题在听力教学和听力理解中具有核心的地位。影响听音解义的因素很多。在听力教学实践中,发现识别语言变素的不同形式对提高听力教学效果和听力理解水平具有很重