论文部分内容阅读
1982年探矿工程科技工作在国民经济调整中取得较好进展,对完成主要生产技术经济指标起到了促进作用。如1982年与1981年相比,完成钻探工作量增长4.3%;台月效率增长7.8%;完全满足地质要求的钻孔率为83.3%,增长4%。后两项指标均创历史最好水平。再如1982年完成坑道工作量比1981年增长17.6%。现将1982年的探矿工程科技进展选介如下:
The scientific and technological work of prospecting engineering in 1982 made good progress in the adjustment of the national economy and played a catalytic role in completing the technical and economic indicators of major production. For example, compared with 1981, the workload of completing drilling increased by 4.3% in 1982; the efficiency of Taiwan and Taiwan increased by 7.8%; and the drilling rate fully meeting geological requirements was 83.3%, an increase of 4%. The last two indicators are the best in history. Another example is the completion of tunnel work in 1982 than in 1981 increased by 17.6%. Now 1982 exploration of prospecting technology progress selected as follows: