论文部分内容阅读
从冷却壁更换方案的确定、冷却壁的选型、施工网络的编制及准备工作等方面,介绍了济钢第一炼铁厂更换高炉冷却壁,进行炉壁再造的经验。
From the aspects of the determination of the replacement plan of the cooling wall, the selection of the cooling wall, the preparation and preparation of the construction network, the experience of replacing the cooling wall of the blast furnace and rebuilding the furnace wall is introduced.