八盘岭公路隧道全长1600m,掘进断面66m~2。本文根据隧道工程口部地质条件,整个隧道围岩稳定性差和施工难度大的特点,提出了口部掘进施工方法,地面和硐内加固支护方案、光面爆破设计,围岩监控测量技术等,以及突破口部难关后,采用的全断面一次掘进施工方法,均取得了良好效果,为保证按期完成施工任务打下了良好的基础。
The total length of the Balingling tunnel is 1600m and the tunneling section is 66m ~ 2. According to the geological conditions at the mouth of the tunnel, the poor stability of the surrounding rock of the whole tunnel and the difficulty of construction, this paper proposes the construction methods of mouth excavation, reinforcement plan of ground and tunnel, smooth blasting design, monitoring and measurement technology of surrounding rock , As well as breakthrough in the mouth after the storm, the use of full face a tunneling construction methods, have achieved good results, in order to ensure the completion of construction tasks on schedule to lay a good foundation.