为了尽快地完成设计任务,促进基本建设高速度地发展,我科同志在思想解放的基础上,猛干再加上巧干,使设计周期大加缩短。以冷加工车间为例:多跨等高的钢筋混凝土结构(吊车50吨以下)的车间,按过去的设计速度要200工日,而现在仅要20工日(6工日出基础图),效率提高10倍;多跨不等高的钢筋混凝土结构(吊车50吨以下)的车间,设计时间由原来250工日减少为28工日(8工日出基础图),效率也将近提高10
In order to complete the design tasks as quickly as possible and promote the rapid development of the basic construction, our comrades, on the basis of the ideological liberation, have been fierce and skillful to make the design cycle much shorter. Take the cold-workshop as an example: For a workshop with multi-span contoured reinforced concrete structures (below 50 tons of cranes), the design speed should be 200 man-days in the past, but now it only takes 20 man-days (6-days-sunrise base map), efficiency 10 times the number of workshops with unequal heights of reinforced concrete structures (below 50 tons of cranes), the design time is reduced from the original 250 days to 28 days (8 sunrise base maps), and the efficiency is also improved by 10