江口小溪水库是以灌溉为主、兼有农村人畜饮水等综合功能的小(二)水库,其中大坝为浆砌石拱坝,经鉴定为三类坝,属病险库,一旦失事将威胁下游的财产和生命安全,因此需进行除险加固。笔者在查明水库病害的成因后,通过结合该水库的特点进行分析,作了除险加固设计方案比选,最终选取了“溢流坝加高2.5m”的设计方案,在实施处理后,蓄水运行证明,推荐方案合理,达到了除险加固之目的。
Jiangkou Brook Reservoir is a small (two) reservoir that is mainly irrigated and has the integrated functions of rural drinking water and other functions. Among them, the dam is a masonry arch dam and has been identified as three types of dams. Threatening the downstream property and life safety, so need to reinforce. After identifying the causes of reservoir diseases, the author analyzed the characteristics of the reservoir and made a comparison and selection of the design schemes of reinforcement and danger elimination. Finally, the design scheme of “overflow dam 2.5m higher” was selected, After the water storage operation proved that the recommended scheme was reasonable and reached the purpose of reinforcement and reinforcement.