论文部分内容阅读
提出了在综合自动化变电站中合用CT保护与测量用二次线圈的方案,分析了这种做法的技术和经济的可行性,并且介绍了南屏工程中为此所做的一些具体工作。
Proposed in the integrated automation substation with CT protection and measurement of the secondary coil program, analyzed the technical and economic feasibility of this approach, and introduced the Nanping project to do some specific work.