论文部分内容阅读
根据新安江水电厂机组增容改造后的实际情况,分析了220 kV母线的安全运行程度,并根据分析结果提出了加大母线载流截面的改进措施。
According to the actual situation of Xin’anjiang hydropower plant after capacity transformation, the safe operation of 220 kV busbar is analyzed. Based on the analysis result, the improvement measures to increase busbar cross section are proposed.