望亭电厂30万瓩机组是在批林批孔运动中开始建设的。为我国自行设计、自行制造的30万瓩双水内冷汽轮发电机组进行土建设计,这还是第一次。这项工程的三结合设计队由电厂、施工单位和我院现场设计队三方面组成。 设计中首先遇到的问题是厂房大与场地小的矛盾。望亭电厂原有10台中、小容量的机组,厂房小,采取的是上排烟系统(屋顶式烟囱),厂区较小。这次扩建已突破了原计划规模。在老厂南
The 300,000 units of Wangting Power Plant began construction in the approved forest movement. It is the first time for the civil engineering design of the 300,000-inch double-water internal-cooled turbo-generator set designed and manufactured by China. The three-in-one design team of this project consists of three aspects: the power plant, the construction unit, and the on-site design team of our hospital. The first problem encountered in the design was the contradiction between large factory buildings and small sites. Wangting Power Plant has 10 original medium- and small-capacity turbines. The plant is small. The upper exhaust system (roof chimney) is adopted and the plant area is small. The expansion has already exceeded the original plan scale. In the old factory south