论文部分内容阅读
我国风电产业已经步入了平稳发展的阶段,但是风电产业所处的外部环境距离我国《可再生能源法》规定的可再生能源并网发电项目的上网电量要全额收购还存在较大差距。2015年要实现弃风限电的根本性转变难度很大。2月12日,国家能源局发布2014年风电产业监测情况数据显示,2014年,我国风电实现并网发电量1534亿千瓦时、并网新增装机1981万千瓦,另据中电联统计2014年风电
China’s wind power industry has entered a stage of steady development. However, the external environment in which the wind power industry is located still has a long way to go before the full purchase of the on-grid electricity of the renewable energy grid-connected power generation project stipulated in the “Renewable Energy Law” in our country. It will be very difficult to achieve the fundamental transformation of curtailment curtailment in 2015. On February 12, the data released by the National Energy Administration for monitoring the wind power industry in 2014 showed that in 2014, the wind power generation in China reached 153.4 billion kWh and the new installed capacity of grid-connected was 21.8 million kilowatts. According to the statistics of CEC in 2014 wind power