论文部分内容阅读
本文主要通过平面二维精细数学模型,计算模拟某工程两个丁坝群整治方案实施后的流场情况,对比分析拟建整治方案实施前后流场的变化,对规划后的河道进行方案比选,提出工程设计建议。
This paper mainly through the plane two-dimensional fine mathematical model to simulate the flow field of two projects after the implementation of the dam group rehabilitation program to compare and analyze the flow field changes before and after the implementation of the proposed remediation program for the planned river program comparison and selection, Proposed engineering design.