前言兴隆庄矿选煤厂是一座年入洗原煤300万t的大型选煤厂,国家建委于1981年10月批准为引进项目,是宝钢的配套工程。该厂是当时煤炭系统最早采用中外联合设计、引进设备与引进技术、引进专利相结合的项目。该厂于1982年1月16日破土动工,于1985年7月30日经国家验收正式移交生产。基建总投资为17557.95万元,其中引进部分为10954.25万元。 1985年到1990年6月共入洗原煤1136.53万t,生产炼焦精煤685.28万t,其中四级冶炼精煤401.81万t,向宝钢提供285.21万t,满足了宝钢的需要。 1985年至1989年五年间,选煤厂共上缴利润18518.50万元,按原价计算(未考虑
Foreword Xinglongzhuang Coal Preparation Plant is a large coal preparation plant with an annual capacity of 3 million tons of raw coal for washing. The State Construction Commission approved the project as an introduction project in October 1981 and is an accessory project of Baosteel. The plant was the coal system was the earliest use of Sino-foreign joint design, the introduction of equipment and the introduction of technology, the introduction of a combination of patents. The plant broke ground on January 16, 1982, on July 30, 1985 by the state inspection officially handed over production. The total infrastructure investment was 175,579,500 yuan, of which 109,554,500 yuan was introduced. From 1985 to June 1990, a total of 11.3653 million tons of raw coal were co-washed to produce 6.8528 million tons of coking coal, of which 4.081 million tons were smelted in fourth grade and 2.8521 million tons were supplied to Baosteel, meeting the needs of Baosteel. From 1985 to 1989 five years, the coal preparation plant a total profit of 185.1850 million yuan, according to the original price (not considered