从1987/88年起,西德汉堡下水的88%斯从现在的科尔勃兰登汉污水处理厂输向正在筹建的德拉特诺污水处理厂。连接这两厂的输送管道长2.2km,在众说纷云的施工方案中,最后采用盾构掘进法。这种机械化盾构掘进机由加拿大提供,生产厂商是多伦多的Lovat公司。主要参数如下:外径4.75m,长7.00m,重150t,最大掘进力20000kN,最大扭矩(在2
From 1987/88 onwards, 88% of the sewage from Hamburg, West Germany, was transferred from the current Kolblandenhan Sewage Treatment Plant to the Drlatno Wastewater Treatment Plant that is under construction. The transmission pipeline connecting these two plants is 2.2km long. In the construction plan with many opinions, the shield tunneling method was used last. This mechanized shield boring machine is provided by Canada and the manufacturer is Toronto’s Lovat Company. The main parameters are as follows: outside diameter 4.75m, length 7.00m, weight 150t, maximum excavation force 20000kN, maximum torque (in 2