论文部分内容阅读
本文以福建省建溪流域四期(政和段)防洪工程为例,对堤基工程的地质情况进行介绍,提出堤基工程常用的几种措施,并最终采用开挖换填的方法对堤基进行处理,对堤基工程的施工措施和质量控制措施进行分析。
This paper takes the flood control project of the fourth phase of Jianxi River Basin in Fujian Province as an example to introduce the geological conditions of the embankment project and puts forward some measures commonly used in the embankment project. Finally, Carry on the treatment, carry on the analysis to the embankment engineering construction measure and the quality control measure.