全面规划加强领导是提高防汛工作的关键——介绍新乡专区第二指挥部全面规划黄河防汛工作的经验

来源 :黄河建设 | 被引量 : 0次 | 上传用户:m374018
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
新乡專区黄河防汛第二指揮部所防守的堤段,处于河南黃河的最下端,与山东毗連。共有临黄、太行、金堤三道堤防。沿河均系低灘,河道全長200余华里,堤綫全長210余公里,河道上寬下窄(寬者40华里,窄者不到10华里),排洪不暢,易于壅高水位。河势弯多善变,溜無定向,尤其經連年上水,灘面淤淀严重,河槽逐年抬高,洪水流量与水位的关系引起了較大的变化。長此以来,自然形成灘唇高、堤根窪、串 Xinxiang area Yellow River flood control headquarters of the second defensive embankment, at the bottom of the Yellow River in Henan, adjacent to Shandong. A total of Lin Huang, Taihang, Jindi three embankments. All along the river are low beach, the river a total length of more than 200 li, embankment line length of 210 kilometers, wide and narrow river channel (a wide 40 li, narrow less than 10 li), poor floods, easy to high water level. River bend more changeable, slip no orientation, especially after successive years of water, beach surface sediment serious riverbed rising year by year, the flood flow and water level caused a greater change in the relationship. Since then, the natural formation of beach lip, embankment depression, string
其他文献
通过对岩芯、铸体薄片、阴极发光薄片观察及X-衍射分析,认为辽河盆地下第三系砂岩储层成岩作用中的压实作用和胶结作用减小和破坏储层孔隙,溶蚀作用则增加储层孔隙,且后者仅在一定
塔里木盆地经历了多期构造运动的改造,共形成了三大类,六个亚类的不整合。这些不整合面(带)是油气良好的运移通道和有利的聚集场所,它们对下伏地层的储集性能有很大的改造作用,同时
1958年黃河防汛工作会議已經胜利閉幕了,黄河防汛总指揮部亦已發布了关于1958年黄河防汛工作的指示。黄河兩岸的广大群众在党和政府的領导下,即將掀起一个群众性的、准备战
较全面地综述了国内外自60年代以来叔锍阳离子聚合物的制备与应用情况。给出了5类叔锍阳离子聚合物的通式、制备方法及应用范围。 A comprehensive review of the domestic and
发动机(ENGINE):engine一词源自中古英语“engin”,意为“天生的才能,由此产生的某种东西”。engine最初仅仅表示某种机灵巧妙的装置。在瓦特(James Watt)发明蒸汽机后,人们
为了保证绝缘漆的使用质量,我厂对~#2浸漆系统进行了技术改造,收到良好效果(见本刊1987年第2期)。现对该系统工作原理简介如下。一、结构浸漆系统改造前仅有一只大漆缸。改
在钻机工作地区分散的情况下,几年来现场照明我们一直使用汽灯,不但不经济,而且每晚整理点时间经常达半小时以上,遇有风天,及昆虫过多之晚,灯具往往因发生故障,造成停工。经
简要介绍了胜利油田一口五段制多目标定向井——老斜29井的工程设计情况,总结分析了该井采用的钻具组合、钻井参数、井眼轨迹控制等技术问题。该井的钻探成功为胜利油田海油陆采
为了适应目前大躍进的形势,解决勘測設計工作中存在的任务多、时間短、要求急、地区分散、經驗不足的問題,更好的貫徹总路綫,根据在內蒙灌区和馮家山壩址工作中的体驗,將規
近几年,美国把注意力集中在降低新的重型车辆排放物的研究方面。美国1988年执行的重型车辆排放标准规定,氮氧化物(NO_x)8.2克/千瓦·小时,微粒0.82克/千瓦·小时。到1991年