中国实验快堆(CEFR)的热功率为65 MW,试验发电功率为20 MW,首炉燃料使用UO_2,采用堆本体池式结构和钠-钠-水三回路热传输系统,并首次设立独立的非能动事故余热排出系统。2015年8月前完成相关整改和检修工作,9月按照运行试验计划开堆运行,截至2016年1月23日,反应堆功率运行时间达2 022h,累计896满功率小时,达到堆内辐照试验的技术要求。
China Experimental Fast Reactor (CEFR) has a thermal power of 65 MW, a test power of 20 MW, a UO 2 for the first furnace fuel, a heap-body pool structure and a sodium-sodium-water three-circuit heat transfer system, Non-active accident heat discharge system. The relevant rectification and overhaul work was completed before August 2015. In September, the reactor was started up and operated in accordance with the operation test plan. As of January 23, 2016, the reactor power running time reached 2,022 hours, accumulating a total of 896 full-power hours to reach the in-reactor irradiation test Technical requirements.