论文部分内容阅读
对于机械化大型露天矿,为给国家输送质量合格的铁矿石,是与生产计划、采矿系统、中和配矿、矿石破碎等单位有密切关系,但是,首先还是要求地质资料准确。由于加强了矿山地质工作,及有关单位的共同努力,我矿1980年上半年和去年同期比较,铁矿石综合合格率提高20%,增加了矿山盈利。下面就怎样作好矿山地质工作,提高地质资料准确性问题,谈谈我们的一些体会。
For mechanized large-scale surface mines, in order to deliver qualified iron ore to the country, it is closely related to production planning, mining system, neutralization and ore disintegration, and other units. However, geological data are first and foremost required to be accurate. Due to the strengthening of geological work in mines and the joint efforts of relevant units, the total qualified rate of iron ore increased by 20% in the first half of 1980 compared with the same period of last year, increasing mine profitability. Here’s how to make mine geological work, improve the accuracy of geological data, to talk about some of our experience.