论文部分内容阅读
在石油一厂党委和撫順石油学院党委的直接领导下,参加柵板塔小型试验的职工和撫顺石油学院师生,发揮了敢想敢干的精神,在工作中密切配合,战胜了种种困难,終于使試验获得成功,为大型輕質油填料式吸收塔改装成柵板塔的设计,提供了可靠的参考数据。柵极塔用于石油工业中,将此填料式吸收塔节約大量鋼材及基建費用,並可使劳动生产率大大提高。根据試驗结果,在原有吸收、蒸脱、加热、換热等设备能力不变的情况下,改装后可由三塔吸收改为一塔吸收,节省两个塔及其相应的动力设备,空塔流速由1.0米/秒提高到1.3米/秒,瓦斯处理能力由5万米~3/时提高到6.5万米~3/时,每套裝置每天
Under the direct leadership of the party committee of Oil Factory and the party committee of Fushun Petroleum Institute, the staff and workers who participated in the small-scale pilot test of grid-pylons and the teachers and students of Fushun Petroleum Institute played a daring spirit and worked closely to defeat the various Difficulties, and finally the success of the test for the large light oil filler absorption tower converted into the grid tower design, provides a reliable reference data. Gate towers are used in the oil industry. This packed absorption tower saves a lot of steel and infrastructure costs and greatly increases labor productivity. According to the test results, in the original case of absorption, steam distillation, heating, heat transfer and other equipment capacity unchanged, after conversion can be absorbed by the three towers into a tower absorption, saving two towers and their corresponding power equipment, the superficial velocity From 1.0 m / s to 1.3 m / s, gas handling capacity increased from 50,000 m 3 / h to 65,000 m 3 / h,