论文部分内容阅读
小湾工程是国家实施西部大开发、“西电东送”战略的标志性工程,澜沧江中下游河段“两库八级”梯级开发中的第二级。小湾电站是澜沧江中下游河段的龙头电站,装设有6台单机容量70万k W的混流式机组,总装机规模420万k W,年保证发电量190亿k W·h。华能澜沧江水电股份有限公司小湾水电厂(简称小湾电厂)于2009年12月成立,按照“大公司,小电厂,远程集控,统一运营”的总体思路,遵循“精简、效能、先进、
The project of Xiaowan is a landmark project of the state to implement the strategy of developing the western region and the strategy of ”sending electricity from the west to the east,“ and the second level in the cascade development of the ”two reservoirs and eight levels“ in the middle and lower reaches of the Lancang River. Xiaowan Power Station is the leading power station in the middle and lower reaches of the Lancang River and is equipped with 6 mixed-flow units with a capacity of 700,000 kW and a total installed capacity of 4.2 million kW. The annual generating capacity is 19 billion kw · h. Huaneng Lancang River Hydropower Co., Ltd. Xiaowan Hydropower Plant (hereinafter referred to as Xiaowan Power Plant) was established in December 2009, following the general idea of ”big company, small power plant, remote centralized control and unified operation“ and following the principle of ”streamlining and efficiency ,advanced,