论文部分内容阅读
机电排涝是治涝的一种有力措施,所以,机电排涝站装机容量的选定应与治涝标准相一致。广东省目前采用的“作物生长期间10年一遇连续暴雨不成灾”的治涝标准是1964年确定的.在七十年代,不少同志曾反映这一标准偏低,据此计算的电排站装机容量偏小.省水利学会为了妥善地解决这个技术经济问题,特于
Mechanical and electrical drainage is a powerful measure to control waterlogging, so the selection of installed capacity of electromechanical drainage terminals should be consistent with the standard of flood control. The flood and waterlogging standard currently adopted by Guangdong Province for “continuous torrential rain in 10 years during crop growth” was determined in 1964. In the seventies, many comrades had reflected the low standard and the calculated electricity The capacity of the station installed capacity is too small. Provincial Institute of Water Resources in order to properly solve this technical and economic problems, especially in