论文部分内容阅读
新年伊始,杜社副院长一行6人就赶赴冰天雪地的西北重镇嘉裕关市的酒泉钢铁公司,竞争高炉煤气发电工程。这是我院1999年第一次投标出征。在到达酒钢的当天下午,向热电厂作了方案汇报,听取了厂方意见后,当天晚上对方案作了一些修改。15日向酒钢公司作了汇报,得到了公司领导的好评,当场拍板把工程设计权交给我院,先委托我院进行预可研与工程立项工作。夺得这可喜的一标,为我院迎来了1999年的开门红。
At the beginning of the new year, Vice President Du and his entourage, six, rushed to the Jiuquan Iron and Steel Company, Jiayuguan City, the most important northwestern city in the world, to compete for blast furnace gas power generation projects. This is the first bidding for our hospital in 1999. On the afternoon of arrival at Jiu Steel, a plan report was made to the thermal power plant. After listening to the opinions of the factory, some modifications were made to the plan the same evening. On the 15th, the company made a report to the Jiuquan Iron and Steel Company and was praised by the leaders of the company. On the spot, the engineering design rights were handed over to our hospital and the pre-feasibility study and engineering project were commissioned by our hospital. Won this gratifying standard for our court ushered in the 1999 opener.