杨树浦发电厂28号中压煤粉炉的大修任务,胜利结束了。人们怀着兴奋的心情,检阅了大修的成绩。25个分段验收项目全部评为优良,整个锅炉一次投入成功,主要辅机一次起动成功。效率提高了0.3%,工料都比定额降低了10%,工期比计划提前了一天。更重要的是他们积极认真地贯彻了全国电力会议精神,在这次大修中狠抓了政治思想工作,并把政治思想工作落实到生产工作中去。
Yangpupu Power Plant on the 28th pressure furnace overhaul task, the victory over. People with excitement, reviewed the overhaul results. All 25 sub-acceptance projects were rated as excellent. The entire boiler was successfully put into operation once and the main auxiliary engines were started successfully. The efficiency increased by 0.3%, the work material was reduced by 10% than the quota, and the construction period was one day earlier than planned. What is even more important is that they actively and earnestly implemented the spirit of the National Electricity Conference, paid close attention to political and ideological work during this major overhaul, and implemented their political and ideological work in their production work.