对包钢9号、10号焦炉工程配煤罐的钢渣垫层地基进行了工程设计与施工研究。利用钢渣废料进行大面积深厚地基处理,基坑面积170.5 m×82.5 m,垫层厚度9.0 m,配煤罐基础的基底压力达480 kPa。分析钢渣的游离CaO的影响,及其水化物的胶结作用;陈放5年以上的钢渣其pH值为6,对钢筋腐蚀影响较小。基坑采用分层分段开挖,施工分Ⅰ/Ⅱ层回填,经检测符合设计要求。平板静载荷试验钢渣地基承载力特征值fak=700 kPa,变形模量E0=60 MPa。试验结果符合设计要求。
Engineering design and construction research on the steel slag bedding foundation of the coal blending tank of No. 9 and No. 10 coke oven project of Baotou Steel was carried out. Large-area deep foundation treatment is carried out using steel slag scrap, with a foundation pit area of 170.5 m × 82.5 m and a cushion thickness of 9.0 m. The base pressure of coal blending tank foundation is 480 kPa. Analysis of the impact of free CaO steel slag, and its cement hydration; Chen put more than 5 years of steel slag pH value of 6, less corrosion on the reinforcement. Excavation of the excavation by stratified segmented, construction sub-Ⅰ / Ⅱ backfill, the test meets the design requirements. Flat static load test Steel slag foundation bearing capacity characteristic value fak = 700 kPa, modulus of deformation E0 = 60 MPa. The test results meet the design requirements.