摘 要:在建筑工程施工中,后浇带施工因为其独特地优点在建筑工程施工中得到了广泛的应用,后浇带的施工质量直接影响着整个建筑工程的最终使用情况。由于后浇带施工有其特殊的施工技术要求,在施工过程中需要进行重点控制。本文综合实践工作经验,对建筑工程超长结构后浇带的施工技术展开分析,希望能够为相关工程施工提供一些参考性意见,进而有效减少由于后浇带施工技术问题而引发的建筑工程质量问题,推进建筑行业健康有序地发展。
关键词:建筑工程;超长结构;后浇带;施工技术Abstract: In building construction, the construction of the late poured band because of its unique advantage has been widely used in building construction; the construction quality of post pouring belt directly influences the final use of the entire construction project. Due to the construction of the late poured band have their special construction technology; in the construction process needs to be controlled. Comprehensive practice the work experience, the analysis of the construction technology of super long structure construction of post pouring belt, hope to provide some reference suggestions for relevant engineering construction, and effectively reduce the quality problems because of post pouring belt construction technical problems caused by the construction, promote the healthy and orderly development of the construction industry.
Keywords: Building engineering; ultra structure; post pouring belt; construction technology
中图分类号:TU74
越来越多的建筑工程施工实践证明,在建筑工程的施工过程中,通过设置后浇带来解决沉降差异、钢筋混凝土的收缩变形、混凝土的温度应力等问题有着非常好的效果,后浇带施工的应用越来越广泛。因此,建筑工程超长结构后浇带的施工质量一旦出现问题,会对整个建筑工程后期的结构整体性状态造成不良影响,引发工程的渗漏问题,直接影响了整个建筑工程的使用性能和使用寿命。总之,建筑工程必须对超长结构后浇带的施工技术进行严格的控制和把握,以此促进经济效益与社会效益的和谐发展。
1 后浇带施工技术的功能与作用
后浇带的设置就是为了最大限度地控制钢筋混凝土施工期间由于温度、收缩而出现的变形缝所进行的后浇封闭操作。通常情况下,后浇带会留置于裙房紧连高层的结构部位,后浇带的施工结构需要进行一段时间的保留,然后再采用混凝土进行浇筑,最终形成一个相对连续性的整体结构形态。后浇带的施工质量情况直接影响到建筑结构质量,但是后浇带处存在着断面大、钢筋密集、模板支设难度大等特点,得以有效地控制工作显得尤为重要。
后浇带施工技术的功能与作用主要包含两个方面:首先,解决沉降差。建筑主体、裙房的结构以及基础设计成为一个整体,但是为了保证整体效果,在施工时需要采用后浇带把两部分暂时断开,等到主体结构施工完毕后就能够直接完成大部分沉降量,这时再对连接部分进行混凝土浇灌,高低层连成整体后的具体计算情况要充分考虑后期沉降差引起的附加内力情况,所以需要相对较好的地基土。一般情况下可以采取调压力差、调时间差,以及调标高差等措施来进行调整。
其次,可以减小温度收缩的影响。混凝土在新浇时,其硬结过程中会出现收缩情况,所以建筑工程已经建成的结构非常容易出现受热会膨胀、受冷则收缩的局面,硬结收缩情况主要出现在施工后的1~2个月之间,而温度对结构的作用也是经常性的,一旦变形受到约束,整体结构的内部就会直接出现温度应力,进而引发裂缝现象,而后浇带的设置则可以有效减少收缩应力状态,最终最大限度地提高结构抵抗温度变化的能力。
2 建筑工程超长后浇带的设置要点
整个建筑工程在开始施工之前,要进行严格的后浇带的设置设计,而其设计工作最主要的部分就是超长构的后浇带施工的设计。后浇带施工设置设计的良好与否在一定程度上直接影响到工程项目的施工质量。根据实践经验,超长结构后浇带设计时主要从以下几个方面着手。
(1)遵循超长结构后浇带施工设计的原则。后浇带施工时,坚持“抗放兼备,以放为主”的原则。所谓的“放”就是通过采取措施释放应力来有效减少混凝土裂缝的情况;所谓“抗”就是在进行后浇带施工时,采用混凝土填补建筑物的缝隙,最终达到能够抗衡没有完全释放的预应力的效果。
(2)严格控制超长结构后浇带的间距。施工过程中,要严格按照施工中涉及到的具体技术参数以及施工先后顺序来进行后浇带的预留和设置。一般情况下,矩形构筑物后浇带的间距要控制在30~40m之间最为合理,同时后浇带的具体宽度的确定要结合建筑的结构构造,一般情况下后浇带的宽度控制在700~1000mm之间为宜。
(3)建筑工程超长结构后浇带位置的浇筑设置情况。后浇带在没有进行浇筑之前切勿拆除模板,为了避免建筑梁板的变形,要等混凝土强度、龄期达到规范要求再进行模板和支柱的全面拆除,同时整个结构受力相对较小的部位也要科学地进行后浇带的设置。
3 建筑工程超长结构后浇带的施工技术
3.1 强化后浇带的底板施工
底板混凝土在施工前,要在其垫层上进行一层卷材防水层或涂膜防水层的施工,要注意防水层的垫层应该宽出后浇带两侧各300mm的位置,这样才能够有效增强施工后的抗渗效果,控制底板下地下水的涌入情况。同时为了防止出现底板周围施工水、雨水流入后浇带的情况,要在后浇带两侧大约500mm位置处增设挡水墙,其宽和高依次为 60mm、300mm,然后对墙壁的两侧进行防水砂浆的涂抹操作。
3.2 加强对后浇带浇筑期间的保护管理
后浇带浇筑期间的保护管理对整个建筑工程质量的提高有着重要作用。施工人员要做好后浇带浇筑期间的保护管理工作,例如后浇带预留完成后要在后浇带两侧设置挡水坎来进行加盖封闭,这样才能够有效避免污水的进入;后浇带基础底板的局部混凝土垫层的标高情况要进行约10cm左右的降低处理,能够对沉渣进行及时的过滤处理。
3.3 科学控制后浇带混凝土的浇筑工作
混凝土的浇筑厚度要嚴格按照工程要求的规范和方案展开,这样能够有效防止可能由于浇筑厚度较大以及钢丝网模板的侧压力增大所引发的向外凸出情况,避免浇筑过程中出现尺寸偏差、墙板漏浆、跑模等不良现象。
混凝土振捣时要分层浇筑,有效防止浇筑过程中出现的混凝土浆严重流失问题。一般情况下,混凝土振捣时,振捣棒的规格为小振捣棒36cm的长度,中振捣棒47cm的长度。为了保证混凝土的振捣密实状态,要尽量采用钢钎捣实,而浇筑混凝土后施工缝处理方法主要涉及到压力水冲洗和人工凿毛两种,一定要高度注意两种方法的具体使用时间。压力水冲洗一般在混凝土浇筑后3~6h之间进行,而人工凿毛在混凝土浇筑后一天左右为宜。
此外,在施工中要注意不同类型后浇带混凝土的浇筑时间不同,具体依照先浇筑混凝土的收缩的完成情况来确定,一般情况下在施工后的40~65d为宜。在对后浇带的内钢筋进行浇筑时,要对施工缝进行充分的湿润操作,不能小于24h。
3.4 加强后浇带的质量控制和验收
后浇带模板施工时一定要确保其安装的牢固性,具体的施工质量情况要与钢筋混凝土设计和施工验收规范的要求相符合;对于后浇带施工过程中使用到的相关材料必须具有完备的出厂合格证及产品技术资料,原材料必须送检检测合格。同时在进行质量验收时,对那些底板后浇带隐蔽工程进行图像资料的摄取,这样才能避免问题被掩盖,图像的摄取要对地梁位置、墙板交接处等相关重要部位的具体清理状态进行全面反映。
4 结语
综上所述,在建筑工程中使用后浇带,不仅能够有效地减少收缩应力,而且能够保证整个建筑结构的有效连接。建筑工程超长后浇带施工有其特殊的施工技术要点,要保证其良好的施工质量,就必须对整个工程的施工进行严格的质量控制,强化施工过程中的监督与检查工作,结合每一个工程的要点、难点展开施工方案的具体编制,在施工期间必须根据相关规范要求以及工程展开的实际情况来进行后浇带的合理设置,最终达到保证工程质量良好的目的。
【参考文献】
[1]徐其胜.浅谈超长先脚底板后浇带施工工艺改进[J].中国科技信息,2012(14).
[2]姚泉智,王守贞.浅谈现浇钢筋混凝土结构中后浇带的施工方法[J].四川建材,2011(01).
[3]郭玉龙.后浇带施工技术在钢筋混凝土结构中的应用[J].中国新技术新产品,20l1(12)
关键词:建筑工程;超长结构;后浇带;施工技术Abstract: In building construction, the construction of the late poured band because of its unique advantage has been widely used in building construction; the construction quality of post pouring belt directly influences the final use of the entire construction project. Due to the construction of the late poured band have their special construction technology; in the construction process needs to be controlled. Comprehensive practice the work experience, the analysis of the construction technology of super long structure construction of post pouring belt, hope to provide some reference suggestions for relevant engineering construction, and effectively reduce the quality problems because of post pouring belt construction technical problems caused by the construction, promote the healthy and orderly development of the construction industry.
Keywords: Building engineering; ultra structure; post pouring belt; construction technology
中图分类号:TU74
越来越多的建筑工程施工实践证明,在建筑工程的施工过程中,通过设置后浇带来解决沉降差异、钢筋混凝土的收缩变形、混凝土的温度应力等问题有着非常好的效果,后浇带施工的应用越来越广泛。因此,建筑工程超长结构后浇带的施工质量一旦出现问题,会对整个建筑工程后期的结构整体性状态造成不良影响,引发工程的渗漏问题,直接影响了整个建筑工程的使用性能和使用寿命。总之,建筑工程必须对超长结构后浇带的施工技术进行严格的控制和把握,以此促进经济效益与社会效益的和谐发展。
1 后浇带施工技术的功能与作用
后浇带的设置就是为了最大限度地控制钢筋混凝土施工期间由于温度、收缩而出现的变形缝所进行的后浇封闭操作。通常情况下,后浇带会留置于裙房紧连高层的结构部位,后浇带的施工结构需要进行一段时间的保留,然后再采用混凝土进行浇筑,最终形成一个相对连续性的整体结构形态。后浇带的施工质量情况直接影响到建筑结构质量,但是后浇带处存在着断面大、钢筋密集、模板支设难度大等特点,得以有效地控制工作显得尤为重要。
后浇带施工技术的功能与作用主要包含两个方面:首先,解决沉降差。建筑主体、裙房的结构以及基础设计成为一个整体,但是为了保证整体效果,在施工时需要采用后浇带把两部分暂时断开,等到主体结构施工完毕后就能够直接完成大部分沉降量,这时再对连接部分进行混凝土浇灌,高低层连成整体后的具体计算情况要充分考虑后期沉降差引起的附加内力情况,所以需要相对较好的地基土。一般情况下可以采取调压力差、调时间差,以及调标高差等措施来进行调整。
其次,可以减小温度收缩的影响。混凝土在新浇时,其硬结过程中会出现收缩情况,所以建筑工程已经建成的结构非常容易出现受热会膨胀、受冷则收缩的局面,硬结收缩情况主要出现在施工后的1~2个月之间,而温度对结构的作用也是经常性的,一旦变形受到约束,整体结构的内部就会直接出现温度应力,进而引发裂缝现象,而后浇带的设置则可以有效减少收缩应力状态,最终最大限度地提高结构抵抗温度变化的能力。
2 建筑工程超长后浇带的设置要点
整个建筑工程在开始施工之前,要进行严格的后浇带的设置设计,而其设计工作最主要的部分就是超长构的后浇带施工的设计。后浇带施工设置设计的良好与否在一定程度上直接影响到工程项目的施工质量。根据实践经验,超长结构后浇带设计时主要从以下几个方面着手。
(1)遵循超长结构后浇带施工设计的原则。后浇带施工时,坚持“抗放兼备,以放为主”的原则。所谓的“放”就是通过采取措施释放应力来有效减少混凝土裂缝的情况;所谓“抗”就是在进行后浇带施工时,采用混凝土填补建筑物的缝隙,最终达到能够抗衡没有完全释放的预应力的效果。
(2)严格控制超长结构后浇带的间距。施工过程中,要严格按照施工中涉及到的具体技术参数以及施工先后顺序来进行后浇带的预留和设置。一般情况下,矩形构筑物后浇带的间距要控制在30~40m之间最为合理,同时后浇带的具体宽度的确定要结合建筑的结构构造,一般情况下后浇带的宽度控制在700~1000mm之间为宜。
(3)建筑工程超长结构后浇带位置的浇筑设置情况。后浇带在没有进行浇筑之前切勿拆除模板,为了避免建筑梁板的变形,要等混凝土强度、龄期达到规范要求再进行模板和支柱的全面拆除,同时整个结构受力相对较小的部位也要科学地进行后浇带的设置。
3 建筑工程超长结构后浇带的施工技术
3.1 强化后浇带的底板施工
底板混凝土在施工前,要在其垫层上进行一层卷材防水层或涂膜防水层的施工,要注意防水层的垫层应该宽出后浇带两侧各300mm的位置,这样才能够有效增强施工后的抗渗效果,控制底板下地下水的涌入情况。同时为了防止出现底板周围施工水、雨水流入后浇带的情况,要在后浇带两侧大约500mm位置处增设挡水墙,其宽和高依次为 60mm、300mm,然后对墙壁的两侧进行防水砂浆的涂抹操作。
3.2 加强对后浇带浇筑期间的保护管理
后浇带浇筑期间的保护管理对整个建筑工程质量的提高有着重要作用。施工人员要做好后浇带浇筑期间的保护管理工作,例如后浇带预留完成后要在后浇带两侧设置挡水坎来进行加盖封闭,这样才能够有效避免污水的进入;后浇带基础底板的局部混凝土垫层的标高情况要进行约10cm左右的降低处理,能够对沉渣进行及时的过滤处理。
3.3 科学控制后浇带混凝土的浇筑工作
混凝土的浇筑厚度要嚴格按照工程要求的规范和方案展开,这样能够有效防止可能由于浇筑厚度较大以及钢丝网模板的侧压力增大所引发的向外凸出情况,避免浇筑过程中出现尺寸偏差、墙板漏浆、跑模等不良现象。
混凝土振捣时要分层浇筑,有效防止浇筑过程中出现的混凝土浆严重流失问题。一般情况下,混凝土振捣时,振捣棒的规格为小振捣棒36cm的长度,中振捣棒47cm的长度。为了保证混凝土的振捣密实状态,要尽量采用钢钎捣实,而浇筑混凝土后施工缝处理方法主要涉及到压力水冲洗和人工凿毛两种,一定要高度注意两种方法的具体使用时间。压力水冲洗一般在混凝土浇筑后3~6h之间进行,而人工凿毛在混凝土浇筑后一天左右为宜。
此外,在施工中要注意不同类型后浇带混凝土的浇筑时间不同,具体依照先浇筑混凝土的收缩的完成情况来确定,一般情况下在施工后的40~65d为宜。在对后浇带的内钢筋进行浇筑时,要对施工缝进行充分的湿润操作,不能小于24h。
3.4 加强后浇带的质量控制和验收
后浇带模板施工时一定要确保其安装的牢固性,具体的施工质量情况要与钢筋混凝土设计和施工验收规范的要求相符合;对于后浇带施工过程中使用到的相关材料必须具有完备的出厂合格证及产品技术资料,原材料必须送检检测合格。同时在进行质量验收时,对那些底板后浇带隐蔽工程进行图像资料的摄取,这样才能避免问题被掩盖,图像的摄取要对地梁位置、墙板交接处等相关重要部位的具体清理状态进行全面反映。
4 结语
综上所述,在建筑工程中使用后浇带,不仅能够有效地减少收缩应力,而且能够保证整个建筑结构的有效连接。建筑工程超长后浇带施工有其特殊的施工技术要点,要保证其良好的施工质量,就必须对整个工程的施工进行严格的质量控制,强化施工过程中的监督与检查工作,结合每一个工程的要点、难点展开施工方案的具体编制,在施工期间必须根据相关规范要求以及工程展开的实际情况来进行后浇带的合理设置,最终达到保证工程质量良好的目的。