论文部分内容阅读
为满足国家可持续发展对新能源的需求,我国明确“十五”期间风力发电的发展目标。 “十五”期间,我国计划新增风电容量1192MW。其中达板城及阿拉山口地区新增98.7MW,内蒙古辉腾锡勒及赤峰地区新增138.5MW,吉林通榆地区新增92.8MW,黑龙江富锦及木兰地区新增61.8MW,河北张北、黄骅及承德地区新增91.8MW,江苏如东和启东地区新增90MW,辽宁营口、大连、沈阳等地新增97.6MW,广东南澳、惠来和湛江等
In order to meet the national demand for new energy for sustainable development, China has clearly defined the development goals of wind power during the “10th Five-Year Plan” period. During the 10th Five-Year Plan period, China plans to add 1192 MW of wind power capacity. Among them, 98.7MW was added to Ta-Pak City and Alashankou, 138.5MW was added to Huitengxile and Chifeng in Inner Mongolia, 92.8MW was added to Tongyu, Jilin, and 61.8MW was added to Fujin and Mulan in Heilongjiang Province. Newly added 91.8 MW in Chengde, 90 MW in Jiangsu Rudong and Qidong, 97.6 MW in Yingkou, Dalian, Shenyang, Liaoning, Nanao, Guangdong, Huilai, Zhanjiang, etc.