罗伟达于1963年进上海锅炉厂参加工作,先后从事电站锅炉设计、干部管理、科研管理、生产管理和经营技术管理工作。曾任技术组长、生产长、常务副总经理、总经理等职务。1988年评聘为工程师,1995年评聘为高级经济师。 “九五”期间,上海市政府将电站设备制造列为上海的六大支柱产业之一。为了实现电站产业“九五”期间的规划目标,经市经委批准,上海电气集团总公司同意,由上海锅炉厂组建上海开源锅炉工程有限公司,作为上海电站锅炉对外服务的经营窗口,罗伟达被委任为公司总经理。由于罗伟达长期从事锅炉
Luo Weida entered the Shanghai Boiler Works in 1963 to participate in the work, has engaged in power station boiler design, cadre management, scientific research management, production management and management of technical operations. Served as technical leader, production manager, executive vice president, general manager and other positions. Appraised as an engineer in 1988, appraised as a senior economist in 1995. During the Ninth Five-year Plan, the Shanghai municipal government listed power plant equipment as one of the six pillar industries in Shanghai. In order to achieve the planning goal during the Ninth Five-year Plan of the power station industry, upon approval by the Shanghai Municipal Economic Commission, the Shanghai Electric Group Corporation agreed to set up Shanghai Open Source Boiler Engineering Co., Ltd. as Shanghai Shanghai Boiler Works Co., Ltd. as the operating window for Shanghai Power Boiler’s external service and Luo Weida was appointed For the company’s general manager. Due to Long Weida boiler