预防外墙抹灰层裂缝的措施

来源 :建筑工人 | 被引量 : 0次 | 上传用户:wjmwjm009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
许多新老住宅、公寓房等外墙抹灰层,由于没有遵循技术规范且操作上不重视,造成抹灰层有明显的不规则细裂纹。经受多次的气温变化,产生起壳、渗水、甚至脱落。一、原因分析(1)抹灰前对砖墙面的灰尘等没有清除,同时,没有做到隔夜浇水湿润。(2)没有按第一天刮糙、次日抹灰的顺序操作。而是当日刮糙,紧跟抹灰层。有的甚至不分刮糙、抹灰,一次性成活。 Many new and old houses, apartments and other exterior plastering layer, because they did not follow the technical specifications and the operation is not valued, resulting in plaster layer has obvious irregular fine cracks. Withstand many changes in temperature, resulting from the shell, seepage, or even fall off. First, the reason analysis (1) plastering on the brick wall before the dust is not cleared, at the same time, did not do overnight watering moist. (2) did not press the first day scraping rough, the next day in the order of plastering. But the same day scratch, followed by plastering. Some even scratch rough, plastering, one-time survival.
其他文献
期刊
近年来,随着我国传媒产业的高速发展,民生新闻成为新闻业界的新宠,电视民生新闻栏目更是迅速发展成为电视新闻的新潮流,创造了许多收视奇迹。特别是为了抓收视、打品牌、接地
近年来,中国婚恋节目热度逐年下滑,2018年两档知名婚恋节目《非诚勿扰》和《中国式相亲》面临全新转型,分别推出《新相亲时代》与《中国新相亲》两档代际相亲节目,尝试找到一个新
党的十六届四中全会通过的《中共 中央关于加强党的执政能力建设的决 定》提出的加强党的执政能力建设的指 导思想。总体目标和主要任务,是我们党 着眼于实现中国社会主义现
期刊
期刊
本文通过对四管集束式烟囱现场工艺难点实施的描述,主要介绍了深基坑围护、基础大体积砼浇注和钢砼筒壁液压提升倒装式爬模施工的特点和注意事项。 Based on the descriptio
本刊讯北京,8月16日,中国(北京)国际工程机械、建材机械及矿山机械展览与技术交流会(BICES)主办方宣布,BICES2013将于2013年10月15日~18日在北京九华国际会展中心举办。同期还
狂欢文化作为一种历史悠久的节日文化,具有很强的生命力。伴随着互联网和媒介技术的发展,与之类似的群体性活动和文化形态也开始在这个新的虚拟文化空间不断涌现。网络传播的
监理人员在验收框架结构楼板钢筋时,感到最棘手的问题是:柱梁交界处的箍筋加密不到位.我们知道,该部位属于核心加密区,在框架结构中是受力的核心部位,如果箍筋加密不到位,将