崇明县水利工程公司自一九八八年进入市区参加上海市防汛墙加固工程建设,已完成十多项单项工程,在施工中遇到的一个普遍的问题是场地狭窄,不少单位是一些老企业,厂房拥挤,紧靠防汛墙,厂区通道狭小,没有必要的施工场地,无法按照常规来拟定施工组织设计。针对这种情况,我们在具体施工过程中,因地制宜确定施工方案,克服了场地困难,取得了一些体会。
Since 1988, Chongming County Water Conservancy Project Company has entered the urban area to participate in the construction of the flood control wall reinforcement project in Shanghai. It has completed more than 10 individual projects. A common problem encountered in construction is that the site is narrow with many units The old enterprises and factories are crowded and close to the flood control wall. There is no necessary construction site for the tunnels in the factory. Therefore, it is impossible to formulate the construction design in accordance with the routine. In response to this situation, we in the concrete construction process, according to local conditions to determine the construction program to overcome the difficulties on the ground, made some understanding.