论文部分内容阅读
国内施工企业百家争鸣,集团内部采购、管理、运维等政策也百花齐放。近日,2013年中国施工装备管理圆桌论坛期间,由中国施工企业管理协会编制的《中国施工装备使用和管理状况调研问卷分析报告》同期发布。《中国施工装备使用和管理状况调研问卷分析报告》显示:在工程机械采购方面,结合施工企业的工程资质等级来看,“国家特级”和“国家一级”施工企业更多的采取“集团采购”或“集团和分公司按设备价值分别采购”的模式,对于资质级别较低的企业而言,如三级企业,设备采购的模式则更倾向于“分公司统一采购”或“项目部负责采购”的方式。工程机械设备的采购是复杂的过程,品牌、性
There are hundreds of domestic construction companies contending with each other. Policies such as internal procurement, management, operation and maintenance of the Group are also flourishing. Recently, during the 2013 China Construction Equipment Management Roundtable Forum, the “China Construction Equipment Use and Management Questionnaire Analysis Report” prepared by China Construction Enterprise Management Association was released in the same period. “China Construction Equipment Use and Management Survey Questionnaire Analysis Report” shows: In the procurement of construction machinery, construction companies in conjunction with the engineering qualification level, “national special ” and “national level ” construction enterprises more Adopt the mode of “group purchase” or “group and branch respectively purchase by equipment value”, and for the enterprises with lower qualification level, such as level 3 enterprises, the mode of equipment procurement is more inclined to Company unified procurement “or ” project department is responsible for purchasing "approach. Construction machinery and equipment procurement is a complex process, brand, sex