海南省铺前大桥主桥墩桩基础设计桩径4 m,桩基施工过程中采用的钢护筒直径4.3 m,长度25.7 m,如此超大直径的深长钢护筒目前在国内外钻孔灌注桩中鲜有应用。受桥址区砂砾、卵石土、微风化花岗岩等岩土地质条件限制,钢护筒在下沉过程中出现下沉困难的情况时有发生。根据铺前大桥海洋环境及强震区的场地条件、桥址区岩土地质情况,比较了解决铺前大桥主桥墩准4.3 m超大直径钢护筒下沉困难的3种技术方案,并提出对不能下沉就位的钢护筒可通过减小钢护筒长度,适当增加桩基础配筋率的措施,以增强桩基础的抗弯、抗剪能力,满足强震作用下桩基础的抗震性能。
The pile diameter of the main pier pier of Pusan Bridge in Hainan Province is 4 m. The diameter of the steel casing used in the construction of pile foundation is 4.3 m and the length is 25.7 m. At present, the deep steel casing with large diameter is currently used in bored piles at home and abroad Little application. By the gravel of the bridge site, pebble soil, granite and other geotechnical geological conditions, steel casing in the sinking process of sinking occurred from time to time have occurred. According to the marine environment of the Qianqian Bridge and the site conditions of the strong earthquake area and the geotechnical conditions of the bridge site area, three technical solutions to solve the difficulty of the 4.3 m super large diameter steel casing of the main pier of the Qianqian Bridge were compared and the Steel casing can not sink in place by reducing the length of the steel casing, reinforcement of the pile foundation to increase the rate of measures to enhance the pile foundation bending, shear capacity to meet the earthquake under seismic pile foundation performance .