在毛主席革命路线指引下,沈阳冶炼厂和冶金建筑研究院共同试制成功了我国第一台“周期反向电解可控硅供电装置”,已于1973年4月在沈阳冶炼厂铅电解车间开始运行。根据一机部、冶金部的指示,由辽宁省冶金局、北京市机电局主持,于1973年9月13日至17日在沈阳召开了“八千安培周期反向电解可控硅供电装置”鉴定会。参加会议的有沈阳冶炼厂、冶金建
Under the guidance of Chairman Mao’s revolutionary line, Shenyang Smelter and Metallurgical Construction Research Institute jointly trial-produced China’s first “reverse-phase electrolytic silicon controlled rectifier power supply device” and started the lead-acid workshop in Shenyang Smelter in April 1973. run. According to a machine department, Ministry of Metallurgical instructions, hosted by the Liaoning Provincial Metallurgical Bureau, Beijing Municipal Bureau of Electrical and was held in September 1973 from September 17 to 17, held in Shenyang, “eight thousand ampere cycle reverse electrolytic silicon power supply device” Identification meeting. There are smelters to participate in the conference, metallurgical construction