论文部分内容阅读
宣泾路新二号桥为2跨16m装配式后张法预应力混凝土简支梁桥,与桥台连接处设置型钢伸缩缝,桥墩处采用桥面连续构造。桥面铺装层混凝土全长为32m,快车道宽为11m,铺装层混凝土厚为100mm。桥面横向坡度为1.5%,纵向坡度为3.45‰,在低侧每隔6m设置一泄水孔?
Xuanjing Road New No. 2 Bridge is a 2 span 16m prefabricated post-tensioned prestressed concrete simply supported girder bridge, and the abutment with the abutment set up steel expansion joints, the bridge pier by the continuous construction of the deck. Bridge deck paving concrete length of 32m, fast lane width of 11m, paving concrete thickness of 100mm. Bridge deck horizontal gradient of 1.5%, the longitudinal gradient of 3.45 ‰, at the low side set a drain every 6m?