北卡尔古利矿山公司(NKM),在西澳大利亚卡尔古利-博尔德戈尔登地区,经营几座地下矿和一些小露天矿,年产矿石60万吨,生产黄金13.5万盎司。该公司打算将这些矿山合并成一座年产矿石100万吨的露天矿,并命名为大坑露天矿,矿石储量为800万吨,含金5克/吨。为保证生产的长期连续性,在露天生产的同时,在地下继续钻探和坑探。主要的地下工程包括一主斜坡道、一中央提升井及一些水平巷道。
North Kalgoorlie Mining Company (NKM), operating in the Kalgoorlie-Boulder-Golden region of Western Australia, operates several underground mines and a few small opencast mines with an annual output of 600,000 tonnes of ore and 135,000 ounces of gold. The company plans to merge the mines into an open-pit mine with an annual output of 1 million tons of ore, and named it the open-pit mine in Da-pit with 8 million tons of ore and 5 grams of gold per tonne. In order to ensure the long-term continuity of production, we continue to drill and pit underground in the open air production. The main underground works include a main ramp, a central elevation and some horizontal roadway.