1 设计概述 太原第一热电厂泳乐宫选址于生活区中心地段。规划用地为东西长66m,南北长59.2m的矩形地段。总建筑面积5300m~2。北靠已建成的职工体育中心约4000m~2,南面为生活区尽端,设有部分设备用房及外架的冷却水管线;东西两向均隔路与多层板式职工住宅相望。建成后的泳乐宫空间,除部分遮挡于职工中心东南端外,其主入口将与职工礼堂构成中心广场的南北纵轴线。对于广场的完整性构图将起不可缺少的作用
1 Design Overview The Taile No. 1 Thermal Power Plant is located in the center of the living area. The planned land is a rectangular section with a length of 66m from east to west and 59.2m from north to south. The total construction area is 5300m~2. In the north, about 4,000m~2 employees’ sports centers have been built, and the southern part is the end of the living area. There are cooling water lines for some equipment rooms and external racks. The east-west two-way roads are opposite to the multi-story plate-type workers’ houses. After the completion of the Swimming Palace space, except for some sheltered at the southeastern end of the staff center, its main entrance will form the north-south longitudinal axis of the central square with the staff auditorium. For the integrity of the square composition will play an indispensable role