Comparative study of the protective effect using hypothermic cardiopulmonary bypass and normothermic

来源 :医学信息(手术学分册) | 被引量 : 0次 | 上传用户:datoufangyuan
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Objective To explore the detrimental influence of normothermic and hypothermic cardiopulmonary by-pass during open - heart surgery on immunity function,cytokines and complements. Methods Forty patients with con-genital or rheumatic heart disease were randomized to receive the two strategies: normothermie CPB (study group) andhypothermic CPB (control group) ,20 cases in each group. Venous blood samples were collected at each time points ofpreoperation, end of CPB, day 1,4,7,14 postoperatively to examine the plasma level of IL - 2, TNF - α, C3, C4, IgG,IgM, IgA, CD3, CD4, CD8. Results IL -2 in both groups decreased significantly at day 1,4, and returned to normal atday 7 postoperatively. IL - 2 in control group was significantly lower than that in study group postoperatively. TNF - α intwo groups was all higher at time points of end of CPB,day 1,4 postoperatively;in study group,it returned to normallevel at day 7 postoperatively, whereas in control group, it was still higher at day 7 postoperatively than that before oper-ation ,and returned to normal at day 14 postoperatively. C3 in study group was significantly lower at time points of endof CPB,day 1,7 postoperatively than that in control group;C3 in both groups was all higher at time points of end ofCPB, day 1,4 postoperatively;in study group, it returned to normal level at day 7 postoperatively, whereas in controlgroup,it was still higher at day 7 postoperatively than that before operation and returned to normal at day 14 postopera-tively. CA in study group at time points of end of CPB, day 1 postoperatively was significantly lower than that in controlgroup;C4 in both groups was all lower at time points of end of CPB, day 1,4 postoperatively than that before operation.The results showed that IgA after operation in both groups was significantly lower than that before operation, and re-turned to normal at day 7 postoperatively;IgA in study group at day 1 postoperatively was higher than that in controlgroup. IgG in both group at time points of end of CPB,day 1,4 postoperatively was significantly lower than that beforeoperation. IgG in control group was significantly higher at time points of end of CPB, day 1,4 postoperatively was signifi-cantly higher than that in control group. IgM in study group was significantly lower at time points of end of CPB, day 1,4 postoperatively. In control group, IgM was significantly lower at time points of end of CPB, day 1,4,7 postoperativelyand returned to normal at day 14 postoperatively. IgM in study group was significantly higher at day 1,4 postoperativelythan that in control group. CD3 ,CD4 in both groups decreased significantly at time points of end of CPB,day 1,4,andCD3 ,CD4 in study group and CD3 in control group returned to normal at day 7 postoperatively, CD4 in control groupstill lower than that before operation at day 7 postoperatively, and returned to normal at day 14 postoperatively. CD3,CD4 in control group was significantly lower at time points of end of CPB, day 1,4 than that in study group. CD8 in bothgroups increased significantly at day 1 postoperatively ;there was no significant difference between the two groups. Con-dusions The detrimental influence of open - heart surgery under normothermic CPB on humoral and cellular immunityfunction, cytokines and complements is less than that under hypothermic CPB, so normothermic CPB is beneficial for thepostoperative recovery and anti -inflammation function.
其他文献
建筑项目管理中有一个具有普遍意义的问题:建筑工程具有周期长、风险大的特点。在进度、质量和成本的综合管理中,企业为了追求最大的经济利益而刻意追求项目进度的加快和成本的
本文阐述了新形势下的住宅建筑设计的节能措施,并分析了住宅的可持续性。最后论述了住宅建筑设计的节能方案。
建筑工程的施工管理是一项复杂工程,要做好这项工作,需要建筑施工企业认真分析自身特点,充分利用自己长处,采取科学方法提高施工管理素质。文章探讨施工现场管理、施工管理创
电力工程的电力设备安装完毕并经验收合格后,还必须按规定对所安装的电力设备进行交接试验。一般情况下,试验所遵循的是国家标准----《GB50150-2006电气装置安装工程电气设备交
随着房地产的低迷以及地价的屡创新高,对于建筑企业来说,在建筑的工程施工过程中,对成本的有效控制就显得越来越重要了,本文从建筑工程项目的各个环节着手,来对施工成本控制进行分
在高层建筑设计工作中,如何更好地在设计中完善建筑的使用功能,并提高电气系统的安全性是建筑电气设计人员的职责。通过笔者设计实践及了解,总结了几点体会,在此提出,以供探讨。
本文就当前我目常用的外墙保温技术及节能保温材料加以论述。阐述了建筑节能保温材料的特点,建筑节能检测中的方法,在大力推外墙保温技术的同时,要加强新型节能材料的开发和利用
近几年在施工工地上由于施工人员较为复杂,在施工过程中危险事故较多,而施工人员的安全意识又较为偏底,所以安全事故频频发生,造成了经济和财产等较大的损失。所以施工管理工作
目的:加速组织扩张进程.方法:对25例患者不同部位的扩张器内注射苞叶雪莲漫液,且与常规扩张组织对比.结果:苞叶雪莲漫液能有效提高组织扩张速度;其两次扩张之间的间隔时间平
预应力混凝土管桩(PHC桩),打桩前需做好桩锤、桩架选择,确定管桩龄期,打桩过程中插桩、锤打、接桩、送桩均采取了相应的技术措施。该工程中PHC桩所具有的单桩承载力高、桩身耐锤