模式口水电站在首都近郊,为永定河引水工程渠道上一級电站,現已完成發电。根据設計,电站按基荷运轉,裝机容量6000瓩,利用小时数达6000小时,在近期上游用水未發展前,利用小时数可以高达7000—8000。由于首都用电照明負荷比重甚大,負荷曲綫特别尖,故水电站似应担任峯荷較为有利。模式口水电站裝机容量能否再增大一些,最近曾有人提出这个問题,因此作者拟在此談談水能設計中个人所看到的一些問題。
Model Kou hydropower station in the suburbs of the capital for the Yongding River diversion project on a channel power station, has completed power generation. According to the design, the power station will be operated by base load with an installed capacity of 6000 瓩 and utilization hours of 6,000 hours. Up to 7000-8000 hours of utilization can be achieved before the upstream water is developed in the near future. As the proportion of the capital electricity lighting load is very large, the load curve is particularly sharp, it seems hydropower station should be served as peak load more favorable. Mode Hydropower Station hydropower installed capacity can be further increased some people have recently raised this issue, so the author intends to talk about some of the problems seen in the design of hydropower.