论文部分内容阅读
黄河难治为人所共认,自古堤防治理近13000年,仍存在洪灾威胁。1933年洪水后,美国安立逊首先提出在三门峡兴建滞洪水库,以解决黄河洪灾问题。抗战期间,日本人曾在三门峡搜集大量资料,提出在三门峡兴建水库发电站的报告,印有大量资料及设计文件,引起人们的注意。抗战胜利后,由伪行政院公共工程委员会邀请美国治黄顾问团来华,美国派雷巴特(美国陆军工程兵团),萨凡奇(有名的水电专家)及葛罗同(陆军工程兵团)三人来华,具体工作由当时资源委员会全国水力发电工程总处美籍顾问柯登担任,中方由谭葆泰先生总负责,作
The Yellow River refractory people recognized, since the embankment control nearly 13,000 years, there is still the threat of flooding. After the flood in 1933, the United States An Lixun first proposed building stagnant flood reservoirs in Sanmenxia to solve the Yellow River flood problem. During the war of resistance against Japan, the Japanese collected a large amount of material in Sanmenxia, proposed a report on the construction of a reservoir power station in Sanmenxia, and printed a large amount of materials and design documents, arousing people’s attention. After the victory of the Anti-Japanese War, the Public Works Committee of the Pseudo-Executive Yuan invited the U.S. government to visit the Yellow Council to visit China. The United States sent Rebatts (U.S. Army Corps of Engineers), Sanchez (a famous hydroelectric expert) and Ge Luo (Army Corps of Engineers) People come to China, the specific work by the resources committee at the National Hydroelectric Power Engineering Corps as the United States adviser Gordon served as the Chinese side is mainly responsible for Mr. Tan Bao Tai, for