论文部分内容阅读
第一章总则第1条黄土地下建筑的建设,必须遵照毛主席“备战、备荒、为人民”和“深挖洞、广积粮、不称霸”的伟大战略方针,贯彻“大分散、小集中”的原则,做到多快好省。第2条在黄土地下建筑建设各个环节中,应以阶级斗争为纲,坚持党的基本路线,贯彻“鞍钢宪法”精神,加强勘察、设计、施工、建设各单位的协作,实行三结
Chapter 1 General Provisions Article 1 The construction of buildings under the Yellow Land must comply with Chairman Mao’s “great strategic principles of preparing for war, preparing for waste, for the people,” and “deep digging holes, building up grain, and not seeking hegemony,” and implement it.“ Large dispersion, small concentration ” principle, do more quickly save the province. Article 2 In every aspect of construction and construction under yellow land, the class struggle should be the keystone, adhere to the party’s basic line, implement the spirit of the “Anshan Iron and Steel Constitution,” and strengthen the coordination of investigation, design, construction, and construction of all units, and implement the three knots.