Hazard Assessment of Co-seismic Landslides Based on Information Value Method: A Case in 2018 MW6.6 H

来源 :中国地震研究(英文版) | 被引量 : 0次 | 上传用户:gaolch013
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
An MW6.6 earthquake occurred in east Hokkaido,Japan on September 6th,2018.Based on the pre-earthquake image from Google Earth and the post-earthquake image from high resolution ( 3 m ) planet satellite,we manually interpret 9293 coseismic landslides and select 7 influencing factors of seismic landslide,such as elevation,slope,slope direction,road distance,flow distance,peak ground acceleration ( PGA) and lithology.Then,9293 landslide points are randomly divided into training samples and validation samples with a proportion of 7:3.In detail,the training sample has 6505 landslide points and the validation sample has 2788 landslide points.The hazard risk assessment of seismic landslide is conducted by using the information value method and the study area is further divided into five risk grades,including very low risk area,low risk area,moderate risk area high risk area and very high risk area.The results show that there are 7576 landslides in high risk area and very high risk area,accounting for 81.52%of the total landslide number,and the landslide area is 22.93 km2 ,accounting for 74.35%of the total area.The hazard zoning is in high accordance with the actual situation.The evaluation results are tested by using the curve of cumulative percentage of hazardous area and cumulative percentage of landslides number.The results show that the success rate of the information value method is 78.50%and the prediction rate is 78.43%.The evaluation results are satisfactory,indicating that the hazard risk assessment results based on information value method may provide scientific reference for landslide hazard risk assessment as well as the disaster prevention and mitigation in the study area.
其他文献
航班延误是降低旅客对航空公司满意度的重要因素.为进一步提高航空服务质量,以2009-2018年主要航空公司延误航班为研究对象,运用CRITIC法计算影响因素权重,确定主要因素,并采
学位
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
期刊
随着科技的不断进步,大型光机电一体化装备加工制造业发展迅速,其零部件的尺寸已达几十米甚至上百米,同时对加工与装配精度却要求达到10-5~10-6量级,因此对相应的激光测距仪器及其信号处理技术提出了更高的要求。本文阐述了绝对距离激光干涉测量技术的现状,分析其信号处理技术的优缺点,并针对现有信号处理技术中被测信号带宽、混频信号漂移及脉冲计数的高频瓶颈等因素造成的相位测量精度低的问题,从电子技术和信号处
学位
本文通过对荣华二采区10
期刊
学位
学位
学位
现代工程结构大量修建于斜坡场地,为确保上部结构的安全性,桩基设计须考虑地基水平承载能力和桩土参数取值问题。本文基于已有试桩资料基础上运用推力桩双参数法和综合刚度原理对西南山区斜坡碎石土地基的双参数和综合刚度的取值进行研究。将计算结果与实测值进行对比,分析斜坡地基桩土相互作用的规律及与水平地基的差异。同时也运用有限元软件建模计算分析斜坡推力桩的受力与变形过程,进一步研究斜坡碎石土地基桩土参数系数的取
学位