论文部分内容阅读
介绍了镇海炼化股份有限公司生产1 号高等级道路沥青的过程, 针对原料、工艺过程控制出现的一些问题, 对装置进行了必要的改造, 实施了相应的措施, 取得了较好的效果
The process of producing No.1 high grade road asphalt by Zhenhai Refining & Chemical Co., Ltd. was introduced. Some problems occurred in the raw material and process control were retrospectively modified, the corresponding measures were implemented and good results were obtained