大兴安嶺的林業生產,由于在各級党委的領導下,政治掛帅,打破常規,把夏季生產淡变旺、閑变忙,战勝自然条件的种种困难,四月初至六月三十日生產了六十五万四千立方公尺木材。超額9%实現了第二季度躍進計划最高指标,超額完成原國家計划71%,超过去年同期產量一倍多。截止六月末已完成全年國家計划的89%。第二季度正是春暖解冻,道路翻漿,再加上夏季經常降雨,道路泥濘,对林業生產利用
The forest production in Daxinganling, due to the difficulties of surrendering the routine, slamming the busy summer production, busy busy and triumphing over the natural conditions under the leadership of party committees at all levels, breaking the routine, Six hundred and fifty-four thousand cubic meters of wood were produced. An excess of 9% achieved the highest level of the second-quarter leapfrog plan, surpassing 71% of the original national plan and more than double the output of the same period of last year. As of the end of June, 89% of the national plan for the year has been completed. The second quarter is thawing in the warm spring, the road is tumble, and the rainfall is often in the summer, the road is muddy, and the forestry production and utilization