在一般情况下,水库调洪计算采用静库调洪,基本上抓住了主要方面,成果尚能与实际符合。但对于库面窄长呈河道型、库位不高、库区流量相对较大的水库,如仍采用静库调洪,误差就较大,特别是库区有防护要求、调洪方式比较复杂时,其误差就更大。这时,就需按《水利动能设计规范》的规定,考虑入库洪水以动库调洪就比较符合实际,达到为防洪安全在计算上的要求。
Under normal circumstances, the reservoir flood control calculation using static reservoir flood control, basically seize the main aspects, the results can still be consistent with the actual. However, if the reservoirs are narrow and long, such as channel type, low reservoir area and relatively large flow in the reservoir area, the error will be larger if the reservoirs are still relatively large in flood control. In particular, there are protective requirements in the reservoir area and the flood control methods are complicated When the error is even greater. At this time, according to the provisions of “Code for Design of Hydraulic Dynamic Energy”, it is more realistic to consider the flooding of the reservoir in order to mobilize the reservoir for flood control, so as to meet the computational requirements for flood control safety.